Improved Amine Filtration Package
This package will be used in gas sweetening units. A part of circulating Amine in the gas sweetening cycle after regeneration and before re-entering the acid gas absorption cycle enters the filtration package in order to separate solid particles (up to 10 microns) and hydrocarbons as well as separating the Amine degradation products, and then returns back to the sweetening cycle. Due to the environmental pollution, complicated operability, solid waste generation, high supply cost and overseas dependency which are disadvantages of usual pre-coating filters, this part has been eliminated in the improved amine filtration package. Backwash of this system is convenient without opening the filter casing and it will be back into service in a short time with a long service life.
Industries Served
Petroleum and Gas
There are many new variations of paassages of available but majority is simple free text.
Read MoreIndustrial Construction
There are many new variations of paassages of available but majority is simple free text.
Read MoreChemical Research
There are many new variations of paassages of available but majority is simple free text.
Read MorePetroleum and Gas
There are many new variations of paassages of available but majority is simple free text.
Read MoreIndustrial Construction
There are many new variations of paassages of available but majority is simple free text.
Read MoreChemical Research
There are many new variations of paassages of available but majority is simple free text.
Read MorePetroleum and Gas
There are many new variations of paassages of available but majority is simple free text.
Read MoreIndustrial Construction
There are many new variations of paassages of available but majority is simple free text.
Read MoreChemical Research
There are many new variations of paassages of available but majority is simple free text.
Read MoreProvide you the Highest Quality Work
that Meets your Expectation.
Need a High Quality Constructor for your Project?
About Us
Kimia PetroGas Elia Company (KPE) have been registered as an industrial knowledge-based company upon ranking of presidential science and technology department and by taking advantages of almost two decades experience in Engineering Design, Procurement,
-
No.6. Ghavmpour st., Sheikhbahaei Shomali st., Tehran, Iran.
Postal Code: 1995763597 - info@kpeenergies.com
- +98 2188664470-71
- List Item
© Copyright 2023 by KPE (Kimia PetroGas Elia)